Land Use Application Permit # 2020-5183, App. # App-2020-005698, UID # 199857
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Mark Yepsen
Phone:
(952210 - 2634
Email Address:
m.yepsen@outlook.com
Mailing Address:
13778 Crosscroft Pl
Rosemount MN 55068
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-12750020497 485th St
MCGREGOR, MN 55760
SHAMROCK TWPINDIAN PORTAGES:20 T:49 R:23GDMINNEWAWA LAKEYEPSEN, MARK & DEBBIEYEPSEN, MARK & DEBBIE
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
Aitkin
Minnesota 56431

Head east on 2nd St NW toward 1st Ave NW
0.7 mi

Continue onto US-169 N
7.4 mi

Turn right onto MN-210 E
14.1 mi

Turn left onto MN-65 N
7.1 mi

Turn right onto Lake Ave
1.0 mi

Turn right onto 485th St
 Destination will be on the right
0.2 mi
20497 485th St
McGregor, MN 55760

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
I am proposing to build a 15 x 10 garage in our parking area by the road (485th).  This will be a movable building made with heavy duty steel and maintenance free siding.  This will be laid on top of class 5 surface.  The garage will have a roll up door 8 x 7 facing the road with a side door and 2 windows.  This unit will be used to house our side by side, lawn equipment, portable ice house, and other miscellaneous items that need to be protected from the elements and kept secure.  At this time all we have is a small shed with very limited space, we have kept our side by side Ranger out in the elements the past 2 years and the weather has already taken a toll on it along with lawn mowers ect.
What is the height of your structure? 10 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 150 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 0 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 0 CuYd
How close to the property line will any fill be placed or any excavation be done? 0 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
There will be no need

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? No

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #49780 (05/11/2020)

Charge Cost Quantity Total
Non-Taxable
added 05/11/2020 10:00 AM

$50 Flat Fee

$50.00 x 1 $50.00
Grand Total
Total $50.00
Payment 05/11/2020$50.00
Due$0.00

Approvals

ApprovalSignature
ApplicantMark Yepsen - 05/14/2020 12:27 PM
994030fdff1b1931c314a121ce61d147
2007f2d3745e1c5c67b51fbff816ddc6
#1 Adminstrative Approval GroupKim Burton - 05/14/2020 12:35 PM
23e5d6c7c531b11c577a544f9e1a6a4c
5f5ff32f64da2cf0766d2ff76a668aa7
#2 Inspector GroupKim Burton - 05/14/2020 12:43 PM
d8070844864a834cec44daaf8b4dfb4a
e0744f890897d7a9164645d00bb056bf
#3 Level Three Final ActionMolly Burman - 05/14/2020 1:24 PM
6199bf86368ec545ef8e41b6ba78b58d
af087a3bab05b924aa0503b708f2e4c5
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit # 45002. Approved for a 10 X 15 garage.
File(s):

Admin Checklist

Date application was complete: 05/14/2020
Review started by: Kim Burton
Zoning District of project location: Shoreland
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
    Notes:
    ok to approve per Bryan. Kb
    Was an onsite conducted for this application? Yes
    Powered by