OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone: |
|
||||
Property Owner Email: | annette@rbklaw.net |
Project Location
Property: |
|
Does your property have an E911 address assigned? | Yes |
Project Details
Have you had a pre-application meeting with Planning and Zoning to review your concept plan? | Yes |
Please attach all supporting documents.: |
|
Please select all that apply.: | Lot Line Adjustment |
Number of Lot Line Adjustments
# of Lot Line Adjustments being applied for: | 2 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #49675 (04/30/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/30/2020 3:54 PM | $100.00 | x 2 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 04/30/2020 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Annette Visnovec - 04/30/2020 3:55 PM 4cf534a5b535e3b0f41beeec1217ac41 2cd220780e10a29fc19ad228e48b62de | |
#1 Inspector Group | Pete Gansen - 05/06/2020 9:35 AM b6a4cf133ddbdfd03eb77e8f99ffdc2c 6cfe7319e6ba76b4352c31c11146279d | |
#3 Wetland Review | Becky Sovde - 05/06/2020 10:22 AM 834a12146b9ffbf01f0d999328141a31 45d7b7eb8471f89fea89b58819d63947 | |
#2 Survey Coordinator | Randy Quale - 05/06/2020 9:55 AM 1e74f412cd16029c9f126ad9b9446eea cc64dab078c26878c04a13f4ff48389f | |
#4 Recorder's Office | Mick Moriarty - 05/06/2020 11:30 AM 2ca337d8fc9909d54f873192183bf6dc bc3c40f50fd177440f09ea436c2f6a6d | |
#6 Final Approval Group | Kim Burton - 05/06/2020 12:22 PM 1a8b68c3224b6ea79f421dcdb0c5086c d7f8cb790f5f395d654ae7d84688b04b | |
#5 Auditor | Liz Harmon - 05/06/2020 11:36 AM 43c6ee532722fc0859b1897c0303cb94 f41f83f1d87f0ffddea92603683c1dba |
Text: | Permit # 44964. This parcel has extensive areas of wetland. The dominant soils are Talmoon muck (very poorly drained) and Talmoon fine sandy loam (poorly drained). Both are hydric soils and indicate potential wetland areas. The landowners should obtain approval before any earth moving. RS 5-6-20 Condition of Permit: Maintain compliance with the Wetland Conservation Act. 2020 Taxes must be paid in full before recording LAH 5/6/20 |
File(s): |
|
Is the property Registered (Torrens)? |
Text: | |
File(s): |
Date application was complete: | 04/30/2020 |
This review has been started by: | Kim Burton |
Zoning District: | Farm Residential |
Is this an After-The-Fact application? | No |