Land Use Application Permit # 2020-5351, App. # App-2020-005853, UID # 199614
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Daniel Cornelius Rietveld
Phone:
(218232 - 4219
Email Address:
dananimal50@yahoo.com
Mailing Address:
36232 334th lane
Atkin Mn 56531
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
24-0-00220036232 334th Ln
AITKIN, MN 56431
NORDLAND TWPS:2 T:46 R:26RDSISSABAGAMAH LAKERIETVELD, DANIEL & ROXANNERIETVELD, DANIEL & ROXANNE
Enter directions to the property (if no property address assigned):
County road 47 to Dove Street 3.2 miles to 334th lane 36232

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
I am  proposing a 40* 60 pole building 14' high. With fill being brought in.
What is the height of your structure? 14 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 2400 ft2
Item 2- Structure Type (if applicable): Accessory Building

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 2000 Feet
Will the proposed structure(s) be less than 35 foot maximum height? No
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 90 CuYd
How close to the property line will any fill be placed or any excavation be done? 1000 Feet
What percent slope of the land currently exists on the project site? 5 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
There will be fill to control all erosion.

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #49537 (06/01/2020)

Charge Cost Quantity Total
Non-Taxable
added 05/29/2020 5:37 PM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 06/01/2020$300.00
Due$0.00

Approvals

ApprovalSignature
ApplicantDaniel C. Rietveld - 06/01/2020 8:05 PM
7baeef65269c6da9f8a8b417ef33d72a
fa34824bdb31c571b3a651881369e567
#1 Adminstrative Approval GroupShannon Westerlund - 06/03/2020 8:36 AM
e38b7e45d437a119f5a01ae5db6a3092
16c2bfad5e57cea285962a03cc96b6c3
#2 Inspector GroupBryan Hargrave - 06/11/2020 8:39 AM
d4bfd6ec116add1326376fdc186b505f
47e04d3d8f9fa2ec5647501d78beda61
#3 Level Three Final ActionMolly Burman - 06/11/2020 11:57 AM
e78fcf8aba4763d5c12c5671d0e8a5e7
91f24abadc86f3c66cc5e29a0c6f0a17
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #45111. Approved for a 40 X 60 accessory building
File(s):

Admin Checklist

Date application was complete: 06/01/2020
Review started by: Shannon Wiebusch
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
    Notes:
    Site inspection done by GIS analysis. There are no PL setback or wetland issues. BH
    Was an onsite conducted for this application? No