Land Use Application Permit # 2020-5078, App. # App-2020-005566, UID # 199603
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
HUGO PICON ALVARADO
Phone:
(612963 - 6597
Email Address:
hugompa1973@hotmail.com
Mailing Address:
125 108th ave NW
Coon Rapids MN 55448
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
01-1-09490343029 351ST LN
AITKIN MN 56431
AITKIN TWPSEARLES GARDEN ADDITION OF IRREGULAR LOTSS:28 T:47 R:27NEPICKEREL LAKEALVARADO, HUGO PICON ANDALVARADO, HUGO PICON AND
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
From Aitkin go west on 210, left turn on 432nd pl, then left on 351th ln, about 1/4 of mile. The property doesn't have a address sign because we just requested but is the empty lot in between the last two houses of the road.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
Storage shed, size 10' W X 12' L X 8' H
Buying from Home Depot just need to assemble on site.

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 120 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 90 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 5 CuYd
How close to the property line will any fill be placed or any excavation be done? 30 Feet
What percent slope of the land currently exists on the project site? 2 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Grass

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? No

Additional Info

Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #49526 (04/13/2020)

Charge Cost Quantity Total
Non-Taxable
added 04/13/2020 11:23 AM

$50 Flat Fee

$50.00 x 1 $50.00
Grand Total
Total $50.00
Payment 04/13/2020$50.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantHugo M. Picon Alvarado - 04/20/2020 8:36 PM
8672b6104d2877348d7f67c24340b8eb
1ff3a26a38be539ddcf9d6751fec34ef
 
#1 Adminstrative Approval GroupShannon Westerlund - 04/21/2020 2:26 PM
c3307380223c80e58d2c2269f0f7de6b
309ff8e2025044a495e0d5d9dee6125f
 
#2 Inspector GroupBecky Sovde - 04/23/2020 8:34 PM
0a6e67d1576810ab193d1ee2d903580c
40cfd33791778234de58b33601ff023c
 
#3 Level Three Final ActionKim Burton - 04/24/2020 11:08 AM
94ead84967e55206c3b40f22757f19d0
0a26cb60b9e3c47fef17c6dfe804dc87
 
Application has been approved. All signatures have been obtained.
Text:
Permit # 44920. Approved for a 10 X 12 storage shed.

Shed must be 8 feet further back than current staking.  Spoke to landowner on 4-23-2020 and he said that would be no problem.  RS 4-23-20
File(s):
Text:
emailed Becky, otc? sw

applicant emailed, will submit new plan that meets lake setback. sw 4/20
Returned to applicant to change size and location of shed. sw 4/20/20

emailed applicant- doesn't meet 150 ft setback. seeing if he can move back to meet setback or WAOS. sw 4/14
File(s):
    Date application was complete: 04/21/2020
    Review started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Required OWHL setback distance: 150 ft.
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? N/A
    Septic Tank setback appears to be met with/without an engineer's report? N/A
    Septic Drainfield setback appears to be met with/without an engineer's report? N/A
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Becky Sovde
      Attach necessary inspection forms/photos:
        Notes:
        Spoke to landowner to move structure back 8 feet in order to meet lake setback.  RS 4-23-2020
        Was an onsite conducted for this application? Yes
        Self Install?
        Installer Name:
        None
        New Tanks:
        Existing Tanks:
        Date of Final Inspection:
        Attach Final Certificate of Installation:
          Low Interest Loan or SSTS Grant project?
          Powered by