OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 169 South, turn left on CR 28, turn left on CR 81, left on 381st Ave. (gravel) Driveway with green garage and house |
Project Description
Please describe your proposed project: | Installation of rip rap along the entire shoreline of the property over the ice. Spreading 1.5 inch washed crushed rock prior to rip rap. Rip rap to be at the height of the birch stump on the right of the dock facing the shoreline and blend up to the neighbors' rip rap. Interplant shrubs/vegetation throughout the rip-rap. Additional vegetation above the rip rap to the right of the steps. A no mow buffer zone will be maintained 12.5 feet from the edge of the rip-rap inland. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of alteration. Location of erosion control measures. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 0 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 0 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Other (explain below) |
If other, please explain: | Shrubs/vegetation No mow zone 12.5 feet from top of rip rap |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Interplant appropriate shrubs/vegetation throughout the rip rap using approved methods suggested by the DNR. Also plant vegetation in area above rip rap on the right side of the steps as you face the shoreline. Maintain a no mow buffer zone extending upward 12.5 ft beginning at the top of the rip rap. |
Other Information
Other: | Attached is an email which was forwarded to Sam Seybold Zoning Officer which was our basis for moving forward on the rip rap. We are not aware of when the previous rip rap referenced in the email was installed as this was done prior to our purchasing the property in December 2004. |
Other Attachments (optional): |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #49350 (03/02/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 02/26/2020 3:35 PM $200 Flat Fee |
$200.00 | x 5 | $1,000.00 |
Grand Total | |||
Total | $1,000.00 | ||
Payment 03/02/2020 | $200.00 | ||
Payment 03/03/2020 | $800.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Terry L. Volkmann - 03/02/2020 7:02 PM 18835318f3da0abb4fdc1dcedc3d921b 21f18f4a6163f33ecc79a331b74f548e | |
#1 Adminstrative Approval Group | Kim Burton - 03/06/2020 2:52 PM d6412cdcaeb38a4a1c713b3d12710659 f37fad081be31535ac72296e7d2dd434 | |
#2 Inspector Group | Sam Seybold - 03/06/2020 2:53 PM b850d91a035f0f971542e87e63df2f45 0659442c9b6c65388eeaefa06d35a9ed | |
#3 Final Action | Kim Burton - 03/06/2020 3:27 PM a5a03c6bdb85549d816e933e7a13051c e7fd23afa36a91fa7df56a0a4f83e663 |
Text: | Permit # 44870. Approved for additional rip-rap to historic rip-rap on shoreline. Conditions: Inter-plant trees and shrubs throughout the rip-rap per DNR guidelines. Increase no-mow buffer zone to 12.5 feet above top of rip-rap. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 03/03/2020 |
This review has been started by: | Kim Burton |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Sam Seybold |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | Yes |
Project located in the floodplain? | |
Base Flood Elevation: |