Land Alteration Permit # 2019-4770, App. # App-2019-005148, UID # 198854
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Marie Cecilia Segar
Phone:
(651246 - 0182
Email Address:
segars@comcast.net
Mailing Address:
1510 Oakbrooke Lane
Eagan MN 55122
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
11-1-11290144875 238th Ln
AITKIN, MN 56431
HAZELTON TWPPINE VIEWS:29 T:45 R:27RDBIG PINE LAKE (Hazelton)SEGAR, RICHARD & MARIESEGAR, RICHARD & MARIE
Driving directions to the property from Aitkin.:
169 south, 450th west, 450 th north, 238th east.

Project Description

Please describe your proposed project:
We would like to scrape down the ice damn that was not maintained prior to us purchasing the property to the natural contour of the lake.

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location of all driveways and/or access roads.
Location and size of alteration.
Location of erosion control measures.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 0
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
We will scrape the bulk of the ice damn mechanically, but use a shovel for anything that could fall toward the water

Excavation Details

Nature of Material to be used?
(Check all that apply)
Other (explain below)
If other, please explain:
Not really adding anything
Total Amount of Excavation and/or Fill proposed? (cubic yards) 10 CuYd
Total Area to be Graded and/or Filled? (L x W) 100 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
We will use a silt fence to catch any dirt that possibly crumbles when scraping down the to the lake contour. We will plant seeds and natural plants to prevent erosion after fixing the ice damn

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #48797 (09/11/2019)

Charge Cost Quantity Total
Non-Taxable
added 09/12/2019 8:02 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 10/07/2019$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantMarie C. Segar - 09/12/2019 8:03 AM
8206c0744115f77c5efb0ba9b1ea9bc5
6c1f3fde6cbc80fd6cdeb96b8ff19a98
 
#1 Adminstrative Approval GroupShannon Westerlund - 10/07/2019 12:37 PM
145de635e58d9c51106a66acea1441f9
2f28d0079895bb676f5b19cfa2632c94
 
#2 Inspector GroupSam Seybold - 10/09/2019 11:11 AM
c090a3fa7ddf4f0c803ab910b517d87a
1f6ef62d55b943fd1cdf2006e6db075f
 
#3 Final ActionKim Burton - 10/10/2019 9:36 AM
fc0d6504cae31e7221c01e089468097c
b36d2d78a9aac279fda84029bd99323c
 
Application has been approved. All signatures have been obtained.
Text:
Permit # 44735. Grading annual ice ridge back to original shoreline contour.  Silt fence, mulch and seeding for erosion.
File(s):
Text:
emailed applicant with amount due 9/23 sw
Checked site and ice ridge heave is evident.  10/9/2019 ss
File(s):
Date application was complete: 10/07/2019
This review has been started by: Shannon Wiebusch
Zoning District of project location: Shoreland
Zoning Inspector: Sam Seybold
Attach necessary inspection forms:
    Is the project in the Shore Impact Zone? Yes
    Was an onsite conducted for this application? Yes
    Is this an After-The-Fact application? No
    Project located in the floodplain?
    Base Flood Elevation:
    Powered by