Land Use Application Permit # 2019-4725, App. # App-2019-005120, UID # 198804
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Dave skaj
Phone:
(218821 - 6142
Email Address:
dskaj@frontiernet.net
Mailing Address:
31166 280th st
Aitkin Mn 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: dskaj@frontiernet.net
Property Owner Phone:
(612363 - 2552

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
09-1-08570030956 326th Ln
AITKIN, MN 56431
GLEN TOWNSHIPHASSMAN ACRESS:10 T:46 R:25RDLONG LAKE (GLEN TWP)GAINES, JAMES & ERINGAINES, JAMES & ERIN
Enter directions to the property (if no property address assigned):
hwy 47 south to Nuthatch to 326th Lane

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? Yes
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
24'x50' new accessory structure

Install concrete Driveway 50' X 26'
What is the height of your structure? 14 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 1200 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 145 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 15 CuYd
How close to the property line will any fill be placed or any excavation be done? 15 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Plant grass

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #48747 (09/05/2019)

Charge Cost Quantity Total
Non-Taxable
added 09/17/2019 11:18 AM

$300 Flat Fee

$250.00 x 1 $250.00
Grand Total
Total $250.00
Payment 09/06/2019$150.00
Payment 09/17/2019$100.00
Due$0.00

Approvals

ApprovalSignature
Applicantonline submittal - 09/27/2019 3:52 PM - witnessed by Shannon Wiebusch
3b84b4edd4050736a14d8d593ac17fb7
e0a255d1c78b27c837e151ac8717f678
#1 Adminstrative Approval GroupShannon Westerlund - 09/27/2019 3:52 PM
cccb075d19da23c64f4d0f3e7a46c6cb
b8d97074401c7b371c0662451f5cfdd4
#2 Inspector GroupShannon Westerlund - 09/27/2019 3:53 PM
c013512902dbc3172854bba99146c74d
75a89896cda670f57c501481b76f667e
#3 Level Three Final ActionJan Yearneau - 09/30/2019 10:13 AM
8619e7add68b104e383bc353dd16446b
33ce98e82dfb5606afc2e346b69cab48
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit# 44704 amended on 10/9/19 to a 30'x48' Accessory Building with 1 condition: Must remove 8'x12' deck within 1 year to comply with max building coverage.
(Not for commercial use, Not for human habitation)

Permit# 44704.  Approved for a 24'x50' Accessory Building (Not for commercial use, Not for human habitation)
File(s):

Admin Checklist

Date application was complete: 09/10/2019
Review started by: Shannon Wiebusch
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? Yes
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
    Notes:
    Per BH, ok to amend permit to 30'x48' acc building with 1 condition: remove 8'x12' deck to comply with max building coverage. sw 10/9/19
    
    Ok to approve per Bryan if the existing lean-to is removed. sw 9/27/19
    Was an onsite conducted for this application? Yes