Land Alteration Permit # 2019-4572, App. # App-2019-005064, UID # 198718
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Jared DeBoer
Phone:
(320630 - 6736
Email Address:
jared@mnshoreworks.com
Mailing Address:
11332 Elk Lane NW
Elk River mn 55330
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(651402 - 3978
Property Owner Email Address: lemay360@gmail.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
34-1-08240011806 116th Ln
FINLAYSON, MN 55735
WAGNER TWPRIDGEHAVEN ON PINE LAKES:26 T:43 R:22RDPINE LAKE (WAGNER TWP)HINTON, ANTHONY & MARYHINTON, ANTHONY & MARY
Driving directions to the property from Aitkin.:
From Aitkin take HWY 47 east to HWY 64.  take HWY 65 south to HWY 18.  Take HWY 18 east to 130th Ave. Take 130th ave south to Alder street.  Take alder street east to co rd 25.  Take county road 25 south to 116th ln.  Take 116th ln o 11806

Project Description

Please describe your proposed project:
The goal of the project is to stabilize an eroding slope with the use of native vegetation.  
In a portion of the project EnviroGrid Geo-cellular confinement will be used to stabilize an eroding portion of the slope.  The length of the stabilization will be 50' with a width at the top of the slope of 12' and a width at the bottom of the slope of 8'.

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 0
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Hand Clearing
Please explain:
No trees or shrubs are being removed.

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 6.5 CuYd
Total Area to be Graded and/or Filled? (L x W) 500 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
silt fence will be installed before construction begins.  for revegetation of disturbed areas, all of the area will be seeded with native woodland seed with a cover crop of oats.  all seeded areas will be covered with a Curlex jute net erosion blanket.

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #48663 (08/27/2019)

Charge Cost Quantity Total
Non-Taxable
added 08/28/2019 5:29 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 08/28/2019$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJared E. DeBoer - 08/28/2019 5:38 AM
bf08a5412ed55e713887c96621b77fb6
282bfdf6d4dc7d8ba7b8ae50fde4b2c2
 
#1 Adminstrative Approval GroupShannon Westerlund - 08/28/2019 8:49 AM
838915cad45186a57dd5868343540955
5ac68f3979011997de0489cf9ff86f0a
 
#2 Inspector GroupSam Seybold - 08/28/2019 1:44 PM
3ba40c6aae45c6ae7f2b55cd28d20a1f
a49b02b8d41e1326a3f3caa29f9fd2ee
 
#3 Final ActionJan Yearneau - 08/28/2019 2:31 PM
1051e8542002c29f4d69a25d0e7bb309
a52c25acb5486210ba428435de556d4f
 
Application has been approved. All signatures have been obtained.
Text:
Permit# 44611.  Approved for 10' x 50' slope to be stabilized with EnviroGrid Geo-cellular confinement.
File(s):
Text:
Slope stabilization and native vegetative plantings. ss
File(s):
Date application was complete: 08/28/2019
This review has been started by: Shannon Wiebusch
Zoning District of project location: Shoreland
Zoning Inspector: Sam Seybold
Attach necessary inspection forms:
    Is the project in the Shore Impact Zone? Yes
    Was an onsite conducted for this application? Yes
    Is this an After-The-Fact application? No
    Project located in the floodplain?
    Base Flood Elevation:
    Powered by