Land Alteration Permit # 2019-4563, App. # App-2019-005050, UID # 198704
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Gary Osberg
Phone:
(320293 - 6771
Email Address:
gmosberg@gmail.com
Mailing Address:
141 Colman Court
141 Colman Court
St Joseph MN 56374
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-1-15050033592 433rd Pl
AITKIN, MN 56431
FARM ISLAND TWPBLUE RIDGE ESTATESS:4 T:46 R:27NEBLUE LAKEOSBERG, ERIK JOSBERG, ERIK J
Driving directions to the property from Aitkin.:
Highway 28 south to 339th Lane.  1/2 mile to 433rd Place

Project Description

Please describe your proposed project:
Clear 5 foot wide path from existing future cabin site to the lake shore and create a 20 x 40 foot recreational pad by the lake.

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of alteration.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 12
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Hand Clearing
Please explain:
A chainsaw will be used to remove trees in the pathway and by the lake.  None of them will be over 8 inches in diameter.

Excavation Details

Nature of Material to be used?
(Check all that apply)
Other (explain below)
If other, please explain:
Some existing dirt will be moved by the lake to make the rec pad flat
Total Amount of Excavation and/or Fill proposed? (cubic yards) 1 CuYd
Total Area to be Graded and/or Filled? (L x W) 800 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Other (explain below)
If other, please explain:
no removal or excavation will be required
Describe how you intend to implement this plan
and your finished vegetation plan.:
The 20 x 40 recreational pad will be graded smooth with a small skid loader and hand tools.  The area will be seeded to restore the vegetation

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #48648 (08/25/2019)

Charge Cost Quantity Total
Non-Taxable
added 08/25/2019 12:28 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 08/25/2019$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantGary Osberg - 08/25/2019 12:30 PM
68bce39a4bcf2562488e2ffabae023f0
150b3ab3b9efed08e638c888e0ff2232
#1 Adminstrative Approval GroupShannon Westerlund - 08/26/2019 8:15 AM
6639bda90f42f416bf0e28fa6d001f03
9c9fb59f80909ac0ed1e61962b96a282
#2 Inspector GroupSam Seybold - 08/26/2019 3:03 PM
23300f27c1fe442a5bfd9bb77f23f569
a435165d8c11f283073890b651e117a8
#3 Final ActionJan Yearneau - 08/28/2019 8:42 AM
4e14cc78aecb4322b98ef03f255b0b93
d4ad03b68af30366fcbc4f315f0e914c
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit# 44605.  Approved for Clearing 5 foot wide path to lake, veg clearing and leveling a 20 x 40 recreation pad.
File(s):

Internal Notes

Text:
Looks good onsite. Minimal dirt work required. ss
File(s):
    Powered by