OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Hwy 169 to 250th St west Left (south) on 435th Ave Right (west) on 245th Lane (Tarrymore Road) Left into property at 43809 Cabin at bottom of the hill |
Project Description
Please describe your proposed project: | Level a path diagonally down the hill behind the cabin to allow handicapped family member to access the cabin. Minor excavation only and low retaining walls can be built on the high side of the path where needed for erosion control. No fill expected other than small gravel for the surface. Path to be about 4 feet wide and stop at deck in back of cabin. Path is marked with stakes in photos. |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location of all driveways and/or access roads. Location and size of alteration. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing |
Please explain: | No trees or shrubs are in the path. Expect a Bobcat will be used to make the path level. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel |
If other, please explain: | Path is 85’ long by 4’ wide = 340’ |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 6.5 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 340 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Other (explain below) |
If other, please explain: | Retaining wall can be installed if needed along the path on the high side. |
Describe how you intend to implement this plan and your finished vegetation plan.: |
No change to the vegetation except grass will be replaced by gravel along path. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #48364 (07/25/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/25/2019 12:25 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 09/04/2019 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Evan Johnston - 09/04/2019 10:59 AM e2a8cd8afb7508115fba5c283be5edd0 2c2cf6838869099a12663da3e60d85f4 | |
#1 Adminstrative Approval Group | Shannon Westerlund - 09/06/2019 11:09 AM b862037cf0b73688af81a0f5c6eb9b9a 7cc1680f06cf6158a84b8b4efd25a0f6 | |
#2 Inspector Group | Sam Seybold - 09/16/2019 1:47 PM d4d9c923e927206b7dbd4a416a1b3159 e677f32ce0ad5db107c01bdd60d69559 | |
#3 Final Action | Jan Yearneau - 09/16/2019 2:41 PM 32699cf5993efab3940627cf939b0a91 1a3457bac2a832b247791549e8e3b443 |
Text: | Permit# 44670. Approved 85' X 4' path constructed to a 8' X 3.5' stair landing. Back-sloped for erosion control. |
File(s): |
|
Text: | Owner is making a stair landing and a stair at the end of the path as per my recommendation. Minimal amount of vegetative removal. No tree removal. ss |
File(s): |
Date application was complete: | 09/06/2019 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Sam Seybold |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | |
Base Flood Elevation: |