Land Alteration Permit # 2019-4337, App. # App-2019-004829, UID # 198315
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Joe Emery
Phone:
(218839 - 3965
Email Address:
emeryhydroseeding@charter.net
Mailing Address:
904 Porcupine Trail
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(612390 - 2602
Property Owner Email Address: rulseth@me.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
11-0-01740027468 443rd Pl
AITKIN, MN 56431
HAZELTON TWPS:5 T:45 R:27RDFARM ISLAND LAKEULSETH, RANDY & JACKIEULSETH, RANDY & JACKIE
Driving directions to the property from Aitkin.:
Hwy 169 South to Tame Fish Lake Rd to 443rd Place approx 1 mile on right

Project Description

Please describe your proposed project:
Remove existing rip rap and old peices of fabric. Smooth grade to achieve 3-1 slope, Install new 5oz felt fabric reinstall rip rap adding 12 additional yds. Reseed and mulch areas disturbed. Floating silt curtain will be used through entire process, mulch and staw waddles to secure soil before seed germination. Install 10 red osier dogwood shrubs along shoreline above new rip rap Total  material moved 22 yds

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 0
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Hand Clearing
Please explain:
no vegetation to be removed

Excavation Details

Nature of Material to be used?
(Check all that apply)
Black Dirt
Boulders
Total Amount of Excavation and/or Fill proposed? (cubic yards) 22 CuYd
Total Area to be Graded and/or Filled? (L x W) 500 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Floating Boom
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
floating boom during shoreline work, straw waddles installed at the top of new rip rap. Seeding and straw mulch to be used during germination period. Will be adding 10 red osier dogwoods to shoreline

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #48273 (07/17/2019)

Charge Cost Quantity Total
Non-Taxable
added 07/17/2019 11:23 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 07/17/2019$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJoe W. Emery - 07/17/2019 11:26 AM
2d06c12f48fa7588a113eafcdbc961f6
88a856418b58651f6374cbb22043a799
 
#1 Adminstrative Approval GroupShannon Westerlund - 07/17/2019 12:11 PM
5b971d5e1a48e2fcb9de915a76c6af1f
348a304883aee01a3d40573ef849d935
 
#2 Inspector GroupSam Seybold - 07/17/2019 2:23 PM
0bc500b54c02463c780748999fab8fc1
9162f498010e9bfa8aeebe1967252e90
 
#3 Final ActionJan Yearneau - 07/17/2019 3:13 PM
0604c9a4b93e929df6040fb09ddb7259
f7e9abd5857305676df0a6df967ac6c0
 
Application has been approved. All signatures have been obtained.
Text:
Permit# 44453.  Approved for land alteration.
File(s):
Text:
10 red oshier dogwood shrubs
File(s):
    Date application was complete: 07/17/2019
    This review has been started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Zoning Inspector: Sam Seybold
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone? Yes
      Was an onsite conducted for this application? Yes
      Is this an After-The-Fact application?
      Project located in the floodplain?
      Base Flood Elevation:
      Powered by