OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | S 47 to 220th St (Malmo) E to S 310th Avenue to E 195th Lane |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Residential Other/Performance (Type 3) Residential Operating Permit (Type 3, 4, 5) |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Unknown |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #48112 (06/28/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/28/2019 10:33 AM | $100.00 | x 1 | $100.00 |
added 06/28/2019 10:33 AM | $350.00 | x 1 | $350.00 |
Grand Total | |||
Total | $450.00 | ||
Payment 06/28/2019 | $450.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Robert & Karen Edmond - 06/28/2019 11:01 AM - witnessed by Shannon Wiebusch aa4b99b83f4e75ab4dd365ff41d0a5b9 74ea88227519e92efe83efcd0dfb4765 |
#1 Adminstrative Approval Group | Shannon Westerlund - 06/28/2019 11:01 AM 729edd7aa872f35e5770626fac8f8b66 ea214e28e64b4d984ded98366b57c16b |
#3 Final Approval | Jan Yearneau - 06/28/2019 11:33 AM 91b04e505dd88a2b22d478a3435ad744 0395f462b07624a4f35329284b44be6a |
#2 Inspector Group | Shannon Westerlund - 06/28/2019 11:01 AM 69ea8a67f2c7cff9a3bb0b6bfb29756c ef18a6ad5eacb89d2b24c14837bec603 |
Public Notes
Text: | Permit# 44398. Type III 2 bedroom Other Mound System with Operating Permit# 623 (envelope on shannon's desk) |
File(s): |
|
Admin Checklist
Date application was complete: | 06/28/2019 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
DESIGN REVIEW CHECKLIST
Design Reviewed By: | Terry Neff |
SSTS Type: | Type III |
SSTS Design: | "Other"/Performance System (III, IV, V) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | Yes |
Operating Permit #: | 623 |
Additional info (optional): |