Land Use Application Permit # 2019-4521, App. # App-2019-004914, UID # 198055
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Nicholas Halek-Hooper
Phone:
(218820 - 0174
Email Address:
dependabledemolition@outlook.com
Mailing Address:
296 kirsch ave ne
McGregor MN 55760
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
14-0-04010142713 STATE HWY 65
MCGREGOR MN 55760
JEVNE TWPS:24 T:48 R:24HALEK-HOOPER, NICHOLAS JHALEK-HOOPER, NICHOLAS J
Enter directions to the property (if no property address assigned):
Drive to mcgregor head north on hwy 65 approximately 3/4 of a mile it will be the first driveway on the left after the bridge

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
I am proposing to move the 36x50 garage. To a new location on the property.
What is the height of your structure? 12 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 1800 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 1430 Feet
Will the proposed structure(s) be less than 35 foot maximum height? No
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 150 CuYd
How close to the property line will any fill be placed or any excavation be done? 120 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Grass will be planted on the south facing side of the building and class5 driveway around the other 3 sides. The property is very flat has minimal run off.

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Also had elevation certificate done on property this is the file along with the right of way map
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #48014 (06/17/2019)

Charge Cost Quantity Total
Non-Taxable
added 06/17/2019 9:50 PM

$300 Flat Fee

$250.00 x 1 $250.00
Grand Total
Total $250.00
Payment 07/31/2019$250.00
Due$0.00

Approvals

ApprovalSignature
ApplicantNicholas J. Halek-Hooper - 07/31/2019 4:15 PM
d9b518b936b6394e67877d2c3dbde931
a369dfa284bae2d24e555ee06e877e6b
#1 Adminstrative Approval GroupKim Burton - 07/31/2019 4:28 PM
16757e15d6362a77b994a2c06097a670
2a10c91e6431b7fce85afd1a4cac71a5
#2 Inspector GroupBryan Hargrave - 08/19/2019 8:51 AM
163a921b26e78e99a15097daede6fde0
6b9464ee82beb5bf1243204db95ecff7
#3 Level Three Final ActionJan Yearneau - 08/19/2019 3:21 PM
ed130348a548061c64b44f7cc761e05c
be4ef8ffee7a5fc35e3ed86c83d98b09
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit# 44573.  Approved for a 36x50 garage
File(s):

Admin Checklist

Date application was complete: 07/31/2019
Review started by: Kim Burton
Zoning District of project location: Shoreland
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? Yes
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? N/A
Septic Drainfield setback appears to be met with/without an engineer's report? N/A
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
    Notes:
    I talked to Becky about this application due to the possibility of wetland filling. After she investigated, she told me to go ahead and approve this OTC - no setback issues and they are moving the building to a site that is not in wetlands. BH
    Was an onsite conducted for this application? No
    Powered by