OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Are you the Property Owner? | Yes | ||||||||||||||||||||||||||||||||
If we have questions on the application who should we contact? |
|
Property Owner Contact
Property Owner Email: | jerryscheffer@icloud.com | ||||
Property Owner Phone: |
|
Project Location
Property Location: |
|
Driving directions to the property from Aitkin: | Take hwy 210 west out of Aitken about 4 miles to 444th. Turn left across r.r. tracks. Drive to 34947 which is on the corner. |
Project Description
Please describe your proposed project.: | Remove select trees in wooded area on west side of slope & remove trees around sewer mound area to prevent roots impacting drain lines. Also remove stumps & brush on hillside on west side of stairs to restore yard area. The previous owner cut trees & leftr stumps & shrubs. Oak tree to be removed is about 12" diameter & is about 50 ft from lake shore. Basswood tree is about 20" diameter & about 40 ft from lakeshore. We are rermoving these 2 trees to improve veiw of lake. These trees are in a heavily forested area & will remain forested. We would also like to restore rip-rap area on the shoreline. Previos owner pulled in vegetation from lake & left it on rip-rap area. We would also like to put a storage shed below the hill on the east side in the wooded area. On the east side in the wooded area but not removing any trees we would like to put a small 10x15 storage shed 30 feet from the natural shore. |
Vegetation Removal
Number of Trees to be removed: | 10 |
Number of Shrubs to be removed: | 20 |
Type of Clearing
Please select all that apply: | Hand Clearing |
Please explain: | Trees will be cut down with chainsaw & remove all branches & wood by hand. Will be grinding stump with small stump grinder. Shrubs will be cut by hand. |
Required Attachments
Attach a copy of your plan drawing(s): |
|
Attach photo(s) of the area to be altered as it exists today: |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Approvals
Approval | Signature |
---|---|
Applicant | Jerry L. Scheffer - 06/13/2019 10:12 AM b3c953eba4d386f7cdaebc0d0b884ffe 3662b90262ca3fb69f355c482b28c60c |
#1 Adminstrative Approval Group | Shannon Westerlund - 06/14/2019 9:23 AM 1bcf501075f99f6e80bc9801903347bd 22bd3e2ad136871ea3bc9f7ad5abf2e2 |
Public Notes
Text: | |
File(s): |
Internal Notes
Text: | 6/13 rec'd new attachments 6/12/19 left VM, can't open attachments in HEIC format. sw |
File(s): |