Land Use Application Permit # 2019-4362, App. # App-2019-004720, UID # 197711
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Greg Adam Hansen
Phone:
(218349 - 0342
Email Address:
ghansen5347@gmail.com
Mailing Address:
5347 Evan Rd
Duluth MN 55804
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
18-0-012200LIBBY TWPS:7 T:50 R:24RIVWILLOW RIVERHANSEN, GREG & REBECCAHANSEN, GREG & REBECCA
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
North on 169 to Aitkin County 18.  East on Co 18 to property.  Property is immediately east of Willow River bridge on north side of road.  Fire number 27234

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
I am proposing to build a one-level 24 x 32 hunting shack on a cement slab.  No running water in structure.  Power to be provided by gas generator and propane.
What is the height of your structure? 15 Feet

Project Type

Item 1 - Structure Type: New Residence incl. attached decks/porches/garages
Item 1 - Size: 768 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 1000 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 25 CuYd
How close to the property line will any fill be placed or any excavation be done? 300 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
No issues are expected.  Ground is flat

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Proposed structure is replacing a 18x24 with loft structure that was in significant disrepair.  Structure is designed for recreational use only and occupancy is expected at less than 1.5 months per year.

Existing outhouse on site.  Inspection is pending.

Receipt for composting toilet and outhouse abandonment attached 7/9/19
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #47675 (05/13/2019)

Charge Cost Quantity Total
Non-Taxable
added 05/13/2019 6:20 PM

$400 Flat Fee

$400.00 x 1 $400.00
Grand Total
Total $400.00
Payment 06/25/2019$400.00
Due$0.00

Approvals

ApprovalSignature
ApplicantGreg Adam Hansen - 07/09/2019 8:14 AM - witnessed by Shannon Wiebusch
34ce109aa83441a178f7bfb46b274b46
b25888ce25f4fa199a28f325fac044b0
#1 Adminstrative Approval GroupShannon Westerlund - 07/09/2019 8:14 AM
2f021f1e1ec63dcff732c3fc34d9600f
0d241eee777f5c8a09763d4031ad5f3a
#2 Inspector GroupBryan Hargrave - 07/23/2019 1:03 PM
93b9acea580654d5ea84031d46b48b66
909566d5c6298767353bb0d907423ea4
#3 Level Three Final ActionJan Yearneau - 07/23/2019 1:20 PM
fb0f31382160e88400c2bb9f7e81d070
c875cb552ec71944009441821615be81
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit# 44463.  Approved for a 24 x 32 residence.
File(s):

Admin Checklist

Date application was complete: 07/09/2019
Review started by: Shannon Wiebusch
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? N/A
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
    Notes:
    Site inspection done by GIS analysis. There are no P.L., wetland or floodplain issues. The applicant also owns the 40 to the east. BH
    Was an onsite conducted for this application? No
    Powered by