OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | restoreme2u@yahoo.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | State Hwy 18, 10 miles east of 169 |
Project Description
Please describe your proposed project: | 1. Set up silt fence 2. move sod 3. reshape slope 4. rip rap repair, back slope away from lake 5. re-seed and cover with straw 6. no mowing |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of alteration. Location of erosion control measures. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | Use skid loader to move dirt, sod and rock |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Gravel Rock Boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 4 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 60 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
1. Set up silt fence 2. move sod 3. reshape slope 4. rip rap repair, back slope away from lake 5. re-seed and cover with straw 6. no mowing |
Other Information
Other Attachments (optional): |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #47611 (05/07/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/07/2019 1:42 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 05/07/2019 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Rick D. Hohenstein - 05/07/2019 1:44 PM 97da0c20ade7f90ec98dc8d3503ae87b b7f26dd53c8b26e27f7999233affad5a | |
#1 Adminstrative Approval Group | Becky Sovde - 05/07/2019 4:05 PM aff37f5e22bd973a253771e95cbb6144 1efebd3a787daadac3e536d85936a52a | |
#2 Inspector Group | Becky Sovde - 05/07/2019 4:05 PM af388f207b6747cb0452df7122d48221 641a7102eaabdf4f2d24f97d9db1bb7f | |
#3 Final Action | Kim Burton - 05/08/2019 10:39 AM 9494322e3bd3b04ba7a06339cde0121c 0e3a4b6db25a50c081d751facee97cef |
Text: | Permit # 44233. Approved for annual ice ridge repair. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 05/07/2019 |
This review has been started by: | Becky Sovde |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Becky Sovde |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | No |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | No |
Base Flood Elevation: |