Land Alteration Permit # 2019-3937, App. # App-2019-004394, UID # 197616
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Rick D Hohenstein
Phone:
(218678 - 9060
Email Address:
restoreme2u@yahoo.com
Mailing Address:
39130 state hwy 18
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(218678 - 3408
Property Owner Email Address: restoreme2u@yahoo.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
36-0-04040036753 STATE HWY 18
AITKIN, MN 56431
WEALTHWOOD TWPS:22 T:45 R:26GDMILLE LACSCARLSON, CHARLES H & ELSA P, TTEESCARLSON, MICHAEL S
Driving directions to the property from Aitkin.:
East on State hwy 18, 7 miles, on right

Project Description

Please describe your proposed project:
1. Set up silt fencing
2. save maple tree
3. move sod
4. re-shape slope
5. owner wishes to re-use rock rip rap and backslope away from lake
6. re-seed and cover with straw
7. no mowing

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of alteration.
Location of erosion control measures.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 0
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
using skid loader to move sod and dirt, rocks, etc

Excavation Details

Nature of Material to be used?
(Check all that apply)
Sand
Gravel
Rock
Boulders
Total Amount of Excavation and/or Fill proposed? (cubic yards) 5 CuYd
Total Area to be Graded and/or Filled? (L x W) 100 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
1. Set up silt fencing
2. save maple tree
3. move sod
4. re-shape slope
5. owner wishes to re-use rock rip rap and backslope away from lake
6. re-seed and cover with straw
7. no mowing

Other Information

Other Attachments (optional):

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #47579 (05/02/2019)

Charge Cost Quantity Total
Non-Taxable
added 05/02/2019 2:00 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 05/02/2019$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantRick D. Hohenstein - 05/02/2019 2:01 PM
e40726a2d9f41f595abf6a8ca9eca9cb
204aa956ae988b29b99d3420962aecb5
#1 Adminstrative Approval GroupShannon Westerlund - 05/02/2019 4:13 PM
7dcd1b47d70ee8f425b84c9b740ac9f0
23d64ef2916c910ddcd5e458a5367779
#2 Inspector GroupBecky Sovde - 05/03/2019 8:00 AM
35cd81911f586f8f392b8da2eea8f765
fba96a4b71a9ec6e38cb6bc48464941d
#3 Final ActionKim Burton - 05/03/2019 10:24 AM
0614d0ed6e825bbcaa1bfc841b1c1c41
0db93af71bdd1346e7b22731e85d31fa
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit # 44224. Approved for repair of annual ice ridge.
File(s):

Internal Notes

Text:
File(s):
    Powered by