OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | kpeysar@co.aitkin.mn.us | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | 6 blocks north of Hwys 210 and 169 intersection |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | Yes |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | proposed addition of decking and ramping on Lions Club food building; approx. 140 sq ft connected to existing structure |
Project Type
Item 1 - Structure Type: | Deck/Patio |
Item 1 - Size: | 140 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | No |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #47543 (04/30/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/30/2019 1:57 PM $100 Flat Fee |
$100.00 | x 1 | $100.00 |
Grand Total | |||
Total | $100.00 | ||
Payment 05/08/2019 | $100.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Kirk Peysar - 05/08/2019 9:49 AM - witnessed by Shannon Wiebusch 4bd663e6441e41a44f237448e7c1ff4f d00b2b3e18b963ad1ad69ab9cb13ed73 |
#1 Adminstrative Approval Group | Shannon Westerlund - 05/08/2019 9:50 AM 3ca85f81742763e5ba1339c7b35aa328 d4704cbfe2a8c1ca00dddb68af8c9451 |
#2 Inspector Group | Bryan Hargrave - 05/15/2019 9:15 AM 6ed1fb53041f05b48ea2431740c55c21 2943646950b1d833af9ec4afc4529c96 |
#3 Level Three Final Action | Jan Yearneau - 05/16/2019 1:08 PM beab9664ecef121372c5c69fd9a54c64 def5d4b355d355f31321c13ff73870bd |
Public Notes
Text: | Permit # 44261. Approved for a 140 sq ft deck. 5/13/19 rec'd updated site plan (attached) sw 5/6/19 send permit to Lee Watkins at 44458 334th Lane, Aitkin |
File(s): |
|
Admin Checklist
Date application was complete: | 05/08/2019 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 150 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | Yes |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: |
|
Notes: | |
Was an onsite conducted for this application? | Yes |