Land Alteration Permit # 2019-3922, App. # App-2019-004383, UID # 197574
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Jared DeBoer
Phone:
(320630 - 6736
Email Address:
jared@mnshoreworks.com
Mailing Address:
11332 Elk Lane NW
Elk River MN 55330
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(763516 - 6362
Property Owner Email Address: dcalverley42@gmail.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
36-0-03810036149 STATE HWY 18
AITKIN, MN 56431
WEALTHWOOD TWPS:22 T:45 R:26GDMILLE LACSDECHANTAL, CHRISTOPHER &DECHANTAL, CHRISTOPHER &
Driving directions to the property from Aitkin.:
From Aitkin 169 south to hwy 18 east. property is on the south side of hwy 18

Project Description

Please describe your proposed project:
75' of shoreline that was damaged from ice push over the winter will be stabilized.  it will include resetting the existing rip rap, resetting existing concrete planks and then reshaping the and stabilizing the upper portion of the bank.  the native vegetation will be salvaged to be replanted into the existing buffer.

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of alteration.
Location of erosion control measures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 0
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Hand Clearing
Please explain:
all disturbed vegetation will be salvaged and replanted.

Excavation Details

Nature of Material to be used?
(Check all that apply)
Other (explain below)
If other, please explain:
All materials to be moves are native to the site. including exiting boulders and sand.
Total Amount of Excavation and/or Fill proposed? (cubic yards) 12 CuYd
Total Area to be Graded and/or Filled? (L x W) 600 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Other (explain below)
If other, please explain:
all disturbed areas will be stabilized with rip rap or erosion blanket.  All areas will be replanted with existing native vegetation.
Describe how you intend to implement this plan
and your finished vegetation plan.:
Once the site has been stabilized as described in the plan the native vegetation will be replanted into the area.

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #47537 (04/30/2019)

Charge Cost Quantity Total
Non-Taxable
added 05/01/2019 8:14 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 05/01/2019$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJared E. DeBoer - 05/01/2019 8:15 AM
9a1ad45399fc0482042b3cd9a56d69ac
63d3e5ad215b2b3a2d5174b05b44a339
 
#1 Adminstrative Approval GroupShannon Westerlund - 05/01/2019 10:01 AM
7bb8778be6f4dc3309a6ea65122d2227
bfbce073678108b0079ec426ca2840d3
 
#2 Inspector GroupBecky Sovde - 05/01/2019 2:24 PM
38eafe6d192593bffbc879a55be9121d
88b18c7020b4198170aaf50abb04a37b
 
#3 Final ActionKim Burton - 05/02/2019 9:07 AM
5096c005353d3ebd4082c926407de54d
1091bfa96161100c51d0bdb7a49027e1
 
Application has been approved. All signatures have been obtained.
Text:
Permit # 44207. annual ice ridge repair
File(s):
Text:
File(s):
    Date application was complete: 05/01/2019
    This review has been started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Zoning Inspector: Becky Sovde
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone? Yes
      Was an onsite conducted for this application? No
      Is this an After-The-Fact application? No
      Project located in the floodplain?
      Base Flood Elevation:
      Powered by