App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | No |
Enter directions to the property (if no property address assigned): | Take highway 65 north to 480th Street. Take a left (West) to 216th Place. Take a right (North) to the property. This property is one lot south of 48495 216th Place. |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Design Information
Attach Septic Design & Management Plan: |
Project Description
Please describe your proposed project: | We are proposing to place a 16'x37' concrete slab on grade and move in a Park Model manufactured home. I have or will send in a signed survey that will show all of the current plans including the proposed septic system (tanks and trenches) and well location along with distances shown at 100 feet beyond the OHWL. There will eventually be an unattached deck on the west side that will be set on top of pier blocks. This will also be more that 100 feet beyond the OHWL. I will also be placing a small shed (size TBD) on blocks more towards the northerly edge of the property again more than 100 feet beyond the OHWL. |
What is the height of your structure? | 12 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 663 ft2 |
Item 2- Structure Type (if applicable): | Deck/Patio |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 134 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 100 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 12 Feet |
What percent slope of the land currently exists on the project site? | 14 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Full replanting of native grasses conducive to holding soil together. New trees will be planted to replace the loss of most of the trees on my property due to the August 2018 storm. |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
There was a Septic Sewer permit applied for today, April 29, 2019, by Ladd Construction for my site also so I have not included any information for that as Adam was supplying that information. I will be placing (2) 12' x 12' wood decks on pier blocks towards the lake side of the proposed house that will not be attached to the park model. I do not know the exact location as it will depend on exactly where the septic tanks get placed. Please contact me if you require additional information with regard to this. I will be planting trees upon completion of the placement of the park model and the sewer and water are installed. I was not sure of the exact calculation you were referring to with regard to the slope. Within the construction area (park model placement) it is approximately 14% but I am not excavating but rather holding natural grade to the east side and filling approx. 18" - 24" going to the west so as not to disturb the trees in the middle of the site. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #47522 (04/29/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/29/2019 3:59 PM $400 Flat Fee |
$400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 04/29/2019 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Lenny Carlson - 05/10/2019 3:05 PM 7565d457f4ba9fd5829534fac97a01d3 f3d3f6eb5fabaac42c3ea200744ac6e6 |
#1 Adminstrative Approval Group | Shannon Westerlund - 05/13/2019 4:34 PM 391e61dc48bc99d7359fcb246b306f62 acc0c51c10c426f5e77531fd18ed6b50 |
#2 Inspector Group | Bryan Hargrave - 05/20/2019 9:02 PM 904cbb0758ab6fb711f5133285ec0e59 4cdb735ed0498e6db261d0b48d101adb |
#3 Level Three Final Action | Jan Yearneau - 05/21/2019 1:45 PM 8af71b64415b020788c839942da46ac6 0f71cd8b89ad3c4859f8edc99b9c768b |
Public Notes
Text: | Permit # 44277. Approved for a new residence (663 ft) |
File(s): |
|
Admin Checklist
Date application was complete: | 05/10/2019 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 100 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: |
|
Notes: | |
Was an onsite conducted for this application? | Yes |