OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | west 210, south Cty rd 28 .5 miles, right on 348th Lane |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Design Information
Attach Compliance Inspection.: |
Project Description
Please describe your proposed project: | Garage addition of 30 x 40 |
What is the height of your structure? | 18 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 1200 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 300 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | No |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 30 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 157 Feet |
What percent slope of the land currently exists on the project site? | 0 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
grass |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | No |
Additional Info
Additional info: (optional) |
site plan attached |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #47301 (03/25/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 03/25/2019 7:56 PM $300 Flat Fee |
$250.00 | x 1 | $250.00 |
Grand Total | |||
Total | $250.00 | ||
Payment 05/13/2019 | $250.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | online submittal - 06/14/2019 4:01 PM - witnessed by Kim Burton 0a228b8d6b3184612d330096893e6019 3e069cffcf8fa062fef8f5fcc8d7819c | |
#1 Adminstrative Approval Group | Kim Burton - 06/14/2019 4:01 PM 321cf177cfa7fec4747e9afade16ecff 3477ca6d0f425a1fd63068871fa69990 | |
#2 Inspector Group | Kevin Turnock - 06/14/2019 3:59 PM 4d4b69f15d59e7b58337e94a8543184a 07dbf008601bbc2e03373664e74d9639 | |
#3 Level Three Final Action | Jan Yearneau - 06/17/2019 10:11 AM 865a6d25ff3eab2ee78ba0c479cad35e fc0017565da482e56956f578627226a7 |
Text: | Permit# 44347. Approved for a 30'x40' Accessory Building (not for commercial use, not for human habitation) Condition: Must have culvert outlet re-routed within 45 days of permit issuance. KT |
File(s): |
|
Text: | 6/03/19 This is the complaint property with the culvert that is appears to be draining onto the neighbors property. Do not issue the permit until checking compliance status with the culvert. Check with Kevin and Terry. PPG 5/1 rec'd CI and site plan 3/26/19 Returned to applicant to provide a compliance inspection on septic and indicate distance to west property line, septic system, and well on site drawing, see email. sw |
File(s): |
Date application was complete: | 05/24/2019 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 100 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Kevin Turnock |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |