OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | South of Aitkin on 169 Right on 250th 1.5 miles west At fork with mailboxes, go right on 445th place .5 miles. Stay to right 25389 marker driveway right side of number sign |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
Project Description
Please describe your proposed project: | Per Becky Sovde, we need to get permits for two existing 8x10 sheds she's already reviewed. |
What is the height of your structure? | 8 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 96 ft2 |
Item 2- Structure Type (if applicable): | Accessory Building |
Item 2 - Size: | 96 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 175 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 0 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 0 Feet |
What percent slope of the land currently exists on the project site? | 0 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
N/A |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
This has already been inspected by Becky Sovde. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #47171 (01/20/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 01/20/2019 4:43 PM $50 Flat Fee |
$50.00 | x 1 | $50.00 |
added 01/20/2019 4:43 PM $50 Flat Fee |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $100.00 | ||
Payment 03/03/2019 | $100.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Darelyn Payes - 03/03/2019 2:30 PM 4135c5149e31e2b8546c95bf9a9efea8 2105b3f4d4d0401bd095bc0d8ed8302c |
#1 Adminstrative Approval Group | Becky Sovde - 03/04/2019 8:57 AM fb7e3baec51b9960add330c06125fbff fe6046e5eb537280aea7dac0f7b47715 |
#2 Inspector Group | Becky Sovde - 03/04/2019 8:57 AM 6f4097c2666fc08598c25f4cfcdca3e8 1bcef197d77b7e72d413c4423926fa8c |
#3 Level Three Final Action | Kim Burton - 03/04/2019 9:51 AM aa52d658f071aa8328e3fa46ae7e979d f8b0ce043836823c5db6d55b79e26b31 |
Public Notes
Text: | Permit # 44145. Condition of Permit: Remove travel trailer by May 31, 2019. |
File(s): |
|
Admin Checklist
Date application was complete: | 03/04/2019 |
Review started by: | Becky Sovde |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 150 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | Yes |
Inspector Checklist
Zoning Inspector: | Becky Sovde |
Attach necessary inspection forms/photos: | |
Notes: | See previous permit and photos in the parcel file. RS 3-4-19 |
Was an onsite conducted for this application? | Yes |