OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | No |
Enter directions to the property (if no property address assigned): | Take Us169 north, take a left on 450th ave, turn left on 220th lane. Property is stake with white stakes with pink ribbon, There will also be caution tape mapping out building sites. |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
Design Information
Attach Septic Design & Management Plan: |
Project Description
Please describe your proposed project: | I am proposing to build a 50x100 building with an attached 50x 16 deck. |
What is the height of your structure? | 30 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 5800 ft2 |
Select a Septic Item (if applicable): | Residential Mound (Type 1) |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 151 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 190 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 15 Feet |
What percent slope of the land currently exists on the project site? | 1 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Seed or sod to control additional erosion during run off. |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #47099 (12/20/2018)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/21/2018 6:30 PM $550 Flat Fee |
$500.00 | x 1 | $500.00 |
added 12/21/2018 6:30 PM $350 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $800.00 | ||
Payment 12/21/2018 | $800.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Nicholas Casper - 01/16/2019 3:39 PM 7e549eac191c6bfcf6f4d198035a1284 444ec8125cca5de5c0c14380ef0490f8 |
#1 Adminstrative Approval Group | Shannon Westerlund - 01/16/2019 3:58 PM 6efa3279fa8a20bfffa290d6975f34a6 65fd7d0bce4206daf9b304f14a7f4c1d |
#2 Inspector Group | Becky Sovde - 01/18/2019 10:54 AM 0ebf0aeab18d395e1f9683828b60ee75 62e84ad74c86ca9ffecc04d8b5cc4b03 |
#3 Level Three Final Action | Kim Burton - 01/18/2019 11:54 AM 102ab1065632b26590e00235682d0480 d8aca5e1dbfa03862d3f60f3438584ea |
Public Notes
Text: | Permit # 44131. Approved for 66 x 100 residence and mound septic system. |
File(s): |
|
Admin Checklist
Date application was complete: | 01/16/2019 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 100 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Becky Sovde |
Attach necessary inspection forms/photos: |
|
Notes: | Site visit conducted 11/5/18 for initial lot split. |
Was an onsite conducted for this application? | Yes |