OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | At main intersection, – go south on 169 2.2 miles Turn right onto Hwy 76 – go 1.2 miles Turn right onto Daisy Street (stay right at fork) – to 1.5 miles House is on left side – 42965 Daisy Street |
Project Description
Please describe your proposed project: | I would like to put riprap along my shore due to the erosion that has been occurring over the years. Each year it is getting harder and harder to pull my dock onto shore due to the ridge that's been created. I would like the riprap to be 25 feet wide with a 3-to-1 slope. It would go approximately 4 feet into the water. |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location of wetlands. Location and size of alteration. Location of erosion control measures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | Landscaper will use equipment to shave/shape ridge and to lay riprap rocks. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Rock Other (explain below) |
If other, please explain: | GeoTextile fabric will be under the rock and it will be seeded and mulched to the sides. |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 9 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 100 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Contractor has told me that he will be adding a silt fence and seeding as well. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #46790 (10/08/2018)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/08/2018 11:46 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 01/03/2019 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Scott E. Klingelhofer - 01/03/2019 2:13 PM e3ac941b7ba8d32a5276acf90f39550b 06f599427b1f8ddc824942ccd33b79e1 |
#1 Adminstrative Approval Group | Shannon Westerlund - 01/03/2019 4:13 PM e783734f745f691648acda4036459805 eaed09397abe9c81509d307d0ff70925 |
#2 Inspector Group | Becky Sovde - 01/10/2019 11:11 AM fbf0bd48f4323a36e130108aa054de3d 71f1a677f4406c37b56d869bb1831650 |
#3 Final Action | Kim Burton - 01/11/2019 8:38 AM db0e5b1803b1d51b659047de79762ebf 0e954f7a59dfede69162ee596b1ec8b3 |
Public Notes
Text: | Permit # 44126. Approved for 20 foot wide rip rap land alteration. Condition of Permit: Use amended drawing for dimensions. |
File(s): |
|
Internal Notes
Text: | 12/31/18 received email from applicant, he is contacting the contractor. sw 12/27/18 canceled application due to no activity and no response from applicant for items needed. see email. sw 12/20/18 emailed applicant for erosion control practices and payment. sw 12/11/18 returned to applicant to complete the Erosion Control Practices section and payment of $200 due. SW |
File(s): |