OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Take hwy 169 north of garrison to 450th turn left, drive a couple miles, property is on left |
Project Description
Please describe your proposed project: | Remove, excavate soil for the purpose of dock placement And access to dock. There is a 45" inch tall ice ridge between average water level (as of 4-28-2018) and top ground surface. The excavation of, my estimate is 3.51 cubic yards. For erosion control there will be rock from 1ft diameter down to 1 inch diameter placed in the exposed excavated surfaced area. |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | Most of the work will be by axe, pick and shovel,if large boulders are present I will use back hoe. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel Rock Boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 3.51 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 60 ft2 |
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Other (explain below) |
If other, please explain: | Rock/river rock,boulders |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Rock and boulders will be used on exposed area of excavation |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #45415 (04/29/2018)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/29/2018 3:42 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 05/01/2018 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ronald V. Blackledge - 05/01/2018 7:52 PM 543caf2662803f52e2862a2d0f69078c 7e1f714ae7fc67159c586d1144e497bf | |
#1 Adminstrative Approval Group | Shannon Westerlund - 05/07/2018 11:39 AM 7a430d9a01d74bd92d359fd4d369dbf8 e6b4fdd2cb4be0a7782cc456163bc182 |
Text: | 5/25/2018 Full online refund given. KK Denied 5/16/18 per conversation: landowner plans to excavate 10' wide area for dock access. A permit is not required under 240 sqft. All excavated area will be seeded with permanent vegetation immediately after work is complete; no rock allowed. Full refund will be issued. SW |
File(s): |
Text: | 5/7/18 Shannon will do. SW Was in the area during inspection; full refund to be issued per PG. sw |
File(s): |
Date application was complete: | 05/01/2018 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Shannon Wiebusch |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | |
Base Flood Elevation: |