OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | moeym@aol.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Parcel # 07-1-079600 and 07-0-062004, this is the parcel which is affected by proposed approach. e911 address 43901 owner name is Lee Moey This proposed approach is on Pioneer avenue to gain easier access to property. Proposal includes a 40x60 pole style building for storage |
Project Description
Please describe your proposed project: | We would like to place an approach on pioneer ave and driveway to gain better access to property. All dirt will be placed in lot areas to level off areas. All work will remain far away from house area or lakeshore. All work will be north of current driveway. The building proposed will be 40x60 with cement floor for storage. Building will be 25' away from east lot line on property. Proposed driveway will be 30' from west property line . Driveway will be 15' wide to building. We expect 200 yards of class 5&6 for driveway and relocation of topsoils near proposed building. The topography is kevel and soil dispersion will be shallow and not be in fashion to require silt fences. Grass seed will be placed immediately. |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location of wetlands. Location and size of alteration. Location of erosion control measures. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 2 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Hand Clearing |
Please explain: | There are two trees that are half dead and need to be removed. Building site is close to trees. I think they sre box elder or willow trees. Chainsaws and stump grinder will be told of choice |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 30 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 3000 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Grass will be planted as elevation is level and away from lakeshore |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #44373 (08/24/2017)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/29/2017 11:18 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 08/29/2017 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Matt Gregg - 08/29/2017 11:19 PM 45698fafe9feab57681bcd11c8542bbc 22b896f03df32898ae7ef31f1dd7e3e3 | |
#1 Adminstrative Approval Group | Kalea Suihkonen - 08/30/2017 3:17 PM ba2329c342c11a0a93907e1cd31ddf0b fdd8dc74c8af9c647795d6130c122885 |
Text: | 9.27.17 Full refund of $200 given online. KK 9/11 Denied. Separate land alt for driveway not needed w/ construction of acc bldg. SW 9/5 Inspector notes under App 2017-00240. sw Shannon will do 9-5-17 Matt applied for garage under App-2017-00240 8-30-17 I emailed Matt that a building permit will also be needed for the 40' x 60' accessory building. KS |
File(s): |
Text: | |
File(s): |
Date application was complete: | |
This review has been started by: | |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Shannon Wiebusch |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | |
Was an onsite conducted for this application? | |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | No |
Base Flood Elevation: |