Vegetation Alteration App. # App-2017-001957, UID # 193801
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Are you the Property Owner? Yes
If we have questions on the application who should we contact?
Name:
Ryan Comer
Phone:
(763286 - 7610
Email Address:
rcomer@renovationsystems.com
Mailing Address:
11546 Edison St
Blaine MN 55449

Property Owner Contact

Property Owner Email: rcomer@renovationsystems.com
Property Owner Phone:
(763286 - 7610

Project Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
11-0-06420123492 450TH AVE
AITKIN MN 56431
HAZELTON TWPS:29 T:45 R:27RDBIG PINE LAKE (Hazelton)COMER, JULIE & RYAN TRUSTEESCOMER, JULIE & RYAN TRUSTEES
Driving directions to the property from Aitkin:
Hwy 169 to 250th follow to 450th to property.

Project Description

Please describe your proposed project.:
I am proposing to clear 20% of my lake frontage for access to the lake. We are building a new cabin on this lot. The land hasn't been maintained in many years and is over grown. We also have foundation material and other debris located in the shoreline that needs to be cleaned up/removed. Many dead and sick trees need to be removed.   

We plan to replace many of these trees with new. Our plan includes adding 50 plus new trees. 

I would also like to apply for a permit to have rip rap installed along the shoreline.  

Thank you

Vegetation Removal

Number of Trees to be removed: 15
Number of Shrubs to be removed: 0

Type of Clearing

Please select all that apply:
Hand Clearing
Please explain:
We do all tree removal with a chainsaw and hand trimmers.

Required Attachments

Attach a copy of your plan drawing(s):
Attach photo(s) of the area to be altered as it exists today:

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Approvals

ApprovalSignature
ApplicantRyan E. Comer - 06/17/2017 3:03 PM
a65a27d4bda97036a579a2c68ccf0f54
0a0e215660233c6e25bfec2c09be89f7
#1 Adminstrative Approval GroupBecky Sovde - 07/06/2017 9:32 AM
5764d13ed15640dbe6115e6fc957fdb7
84364f0930876fcb5da0ec6c144c3d88
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Site visit 7-3-17 and 7-21-17 by Becky.  Cleared area being moved, so a new reveg plan is required.
File(s):

Internal Notes

Text:
Comers have already cleared their SIZ.  Get additional info if needed.
Sixty day is 8/14/17
File(s):
    Powered by