OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | East on Hiway 47 to Dam Lake Street /Cty Rd 4. East on Cty Rd 4 to cty Rd 53. Left on Cty Rd 53 to 299th. Right on 299th. Left on 344th Ln. Right into driveway at 29857 344th Ln. |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Design Information
Attach Compliance Inspection.: |
Project Description
Please describe your proposed project: | I am proposing to add a 16x27 foot addition to my existing home. Approximately a10x16 portion of this addition will be used to extend an existing very small bedroom and will include a half bath (toilet & sink). The remainder of the addition will be used to extend an existing living room and provide closet space. One Time 50% volume expansion request |
Project Type
Item 1 - Structure Type: | Residence Addition |
Item 1 - Size: | 432 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 70 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 60 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 70 Feet |
What percent slope of the land currently exists on the project site? | 0 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Grass seeds will be planted and will provide erosion protection identical to what exists now. |
Site Plan
Attach Site Plan: |
Additional Info
Additional info: (optional) |
I originally submitted this permit requesting a 10x27 addition. I subsequently revised the permit request and am now requesting a 16x27 addition. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #1589 (08/24/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/24/2016 9:59 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 08/25/2016 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Luke L. Lucas - 09/09/2016 7:51 AM d1f0afafcf1df41371cc82c2d735c931 f4fe80c0e7a25552b6888602aa3aecb4 |
#1 Adminstrative Approval Group | Kalea Suihkonen - 08/26/2016 9:22 AM 341283be0021ff60727a5855d5c503d3 079a97152a1e0b726fd4499484fde58f |
#2 Inspector Review | |
#3 Final Approval |
Public Notes
Text: | 9/21/2016 Partial refund issued via ACH in the amount of $100 ($100 site inspection is non-refundable) KK The existing structure is 35 feet from the ordinary high water line at its closest point, so a variance would be required to add to the structure. Landowner has been called and notified of the variance process. |
File(s): |
Admin Checklist
Date application was complete: | |
Review started by: | |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 100 ft. |
"Other" OHWL setback distance is: | using 50% volume exp. |
Project located in the floodplain? | No |
Base Flood Elevation: | 1224 |
Lowest Floor Elevation: | VERIFY-appears out per contours |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? |