OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | No |
Enter directions to the property (if no property address assigned): | About 9 miles north on 169 from the town of Aitkin. Then east on 405th Street about a half mile on the south side of 405th Street. |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
Project Description
Please describe your proposed project: | I am proposing to build a storage pole shed 40 x 64 and 15'6" high Hello, please find the updated drawing with measurements on following pages. Setback from road and North property line: 135' Setback from West property line: 315' Setback from East property line: 1000' Setback from South property line: 1135' Setback from Rice river East: 348' Setback from Rice river South: 945' Setback from Rice river Southwest: 450' |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 2560 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 348 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 180 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 135 Feet |
What percent slope of the land currently exists on the project site? | 5 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
There are thick natural trees and vegetation surrounding the pole shed site that will prevent erosion |
Site Plan
Attach Site Plan: |
|
Additional Info
Additional info: (optional) |
I have contracted with Northland Buildings to construct the pole shed. I have hired Ritter Sewer and Excavating to do the excavation work. I have submitted a separate permit application for the related excavation work Setback from road and North property line: 135' Setback from West property line: 315' Setback from East property line: 1000' Setback from South property line: 1135' Setback from Rice river East: 348' Setback from Rice river South: 945' Setback from Rice river Southwest: 450' |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #1471 (08/14/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/14/2016 10:33 AM $175 Flat Fee |
$175.00 | x 1 | $175.00 |
Grand Total | |||
Total | $175.00 | ||
Payment 08/14/2016 | $175.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | James Miller - 08/14/2016 10:33 AM f1fa492c1872822b6ac75cd5d0058097 279b50c2751ccd0df00bf2f2cc9729d1 | |
#1 Adminstrative Approval Group | Kristi Kunz - 08/17/2016 11:45 AM 9b085cb702d70e367cebe7b01bfe6902 463f0a22b732d82c8bec856e1f40280b | |
#2 Inspector Review | ||
#3 Final Approval |
Text: | 8/24/2016 partial refund of $75 given through ACH ($100 site inspection is non-refundable). KK Property is in the floodplain and must have a Certificate of Elevation. The fill required may impact wetland areas around the building site, so the fill extent must be staked on site. An adequate site plan must be presented indicating measurements and layout, and the proposed structure location must be clearly staked on site. Also note that the paths to the lake cross numerous wetland areas that cannot be filled. |
File(s): |
|
Text: | 8.17.16 I requested the applicant's signature - he resubmitted a site drawing and didn't approve. KK |
File(s): |
Date application was complete: | |
Review started by: | Kristi Kunz |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 150 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Becky Sovde |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |