OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | davehazelton@frontier.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | Down 47 to mile marker 114, east 1/4 mile (on the left) |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | 12x44 ft deck |
Project Type
Item 1 - Structure Type: | Deck/Platform |
Item 1 - Size: | 528 ft2 |
Site Plan
Attach Site Plan: |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #866 (06/14/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/14/2016 11:09 AM $125 Flat Fee |
$125.00 | x 1 | $125.00 |
Grand Total | |||
Total | $125.00 | ||
Payment 06/14/2016 | $125.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Kristine Hazelton - 06/14/2016 11:11 AM - witnessed by Shannon Wiebusch 6c43a80905a8b27d55da1fd073fcdca9 f0d541dac1d43d08b64d388494108bf2 |
#1 Adminstrative Approval Group | Kalea Suihkonen - 06/14/2016 11:12 AM f2f7b25f123215b353e1d37485645696 57c2372d8486963163323590d89bb2fd |
#2 Inspector Group | Bryan Hargrave - 06/28/2016 9:27 PM a3f8a7a36e0479338d40fefbdf7bb216 1922264c24b605d853ea24754b549e99 |
#3 Level Three Final Action | Kalea Suihkonen - 06/29/2016 9:47 AM 8813301697d099221ddd76cfb1f3d56a 52186b53b595e301d326ed5c12f2271c |
Public Notes
Text: | P#42105 approved for a 12x44 ft deck (deck >100 sq ft) (not to be enclosed) |
File(s): |
|
Admin Checklist
Date application was complete: | |
Review started by: | |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: |
|
Notes: | |
Was an onsite conducted for this application? |