Land Use Application Permit # 2016-0334, App. # App-2016-000409, UID # 1081
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Brad Busbey
Phone:
(218829 - 1768
Email Address:
bbusbey@andersonbrothers.com
Mailing Address:
P.O. Box 668
brainerd mn 56401
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: sdslette@fronternet.net
Property Owner Phone:
(218838 - 2881

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
09-0-05280028513 330th Ave
AITKIN, MN 56431
GLEN TOWNSHIPS:31 T:46 R:25NETHIRTY-ONE LAKESLETTE, STEVESLETTE, STEVE
Does your property have an E911 address assigned? No
Enter directions to the property (if no property address assigned):
From Glen go 1.75 west on CR 12, take a right(north) onto haul rd. follow haul rd 1mile north to pit area

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? Yes
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No

Project Description

Please describe your proposed project:
To operate a temporary portable asphalt plant for the Aitkin County CSAH 2,12,13 and 24 projects awarded to Anderson brothers Construction. The area used for plant  and recycled asphalt will be approximately 425' x 325'.

Project Type

Item 1 - Structure Type: Asphalt Plant
Item 1 - Size: 138125 ft2

Additional Info

Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #779 (06/06/2016)

Charge Cost Quantity Total
Non-Taxable
added 06/08/2016 8:31 AM

$650 Flat Fee

$650.00 x 1 $650.00
Grand Total
Total $650.00
Payment 06/08/2016$650.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantBrad Busbey - 06/06/2016 11:47 AM
1e96718e98e8460c36dc34fa77fdfaf5
a989f13f86f5bed0876862abf174f38b
 
#1 Adminstrative Approval GroupKristi Kunz - 06/09/2016 11:37 AM
58d28805f3fd7d92648355fd42803a4f
33fe73cbebd22cc0b7990b9c2e3c4a0f
 
#2 Inspector GroupKristi Kunz - 06/09/2016 11:38 AM
4725c5879aba0a8e36c022e422a1ce3e
a5e70acde4320520e17999654f5319d9
 
#3 Level Three Final ActionKristi Kunz - 06/09/2016 11:38 AM
a86ec249b849fea03850fe46466beb78
b3da6be443db89a07993074bfa4bfc1a
 
Application has been approved. All signatures have been obtained.
Text:
P#42022 approved for a 4-week asphalt plant per application #2016-000409.
File(s):
Text:
File(s):
    Date application was complete:
    Review started by: Terry Neff
    Zoning District of project location: Open
    Required OWHL setback distance:
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? N/A
    Septic Tank setback appears to be met with/without an engineer's report? N/A
    Septic Drainfield setback appears to be met with/without an engineer's report? N/A
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Terry Neff
      Attach necessary inspection forms/photos:
        Notes:
        OTC - 4 week asphalt plant.
        Was an onsite conducted for this application?
        Self Install?
        Installer Name:
        None
        New Tanks:
        Existing Tanks:
        Date of Final Inspection:
        Attach Final Certificate of Installation:
          Low Interest Loan or SSTS Grant project?
          Powered by